Made with Kleap
Keyhole.
Track record

Proven at city scale.

From single-corridor pilots to PAN-India rollouts โ€” Keyhole delivers, integrates and maintains traffic infrastructure that holds up under real-world load.

600+
Junctions
4
States
4
Tech verticals
24/7
Field support
Featured deployments

A few experiences.

Each engagement below is a real, on-ground deployment โ€” installed, commissioned and supported by Keyhole Design teams.

NCT of Delhi

Delhi

300+
Traffic signals

300+ traffic signals installed and maintained

Across the National Capital Territory โ€” adaptive signalling, maintenance contracts and lifecycle support.

Assam

Guwahati

66+
ATCS ยท RLVD ยท ANPR ยท SVD

66+ ATCS, RLVD, ANPR & SVD junctions

Adaptive Traffic Control Systems, Red Light Violation Detection, Automatic Number Plate Recognition and Speed Violation Detection โ€” fully integrated.

Chhattisgarh

Chhattisgarh

35+
ANPR junctions

35+ ANPR junctions

Automatic Number Plate Recognition deployment across multiple corridors, with central monitoring and enforcement integration.

Uttarakhand

Haridwar

6+
RLVD ยท SVD ยท ANPR + ICCC

6+ RLVD, SVD & ANPR junctions โ€” integrated with ICCC

Integrated Command & Control Centre integration, enabling unified monitoring across violation detection and enforcement systems.

Technology stack

Four verticals. One integrator.

We design, procure, install and maintain each system end-to-end โ€” including civil works, power, networking and integration with city command centres.

ATCS

Adaptive Traffic Control System

Real-time signal timing adjustments based on traffic density, reducing congestion and improving flow at junctions.

ANPR

Automatic Number Plate Recognition

Camera-based plate capture for enforcement, tolling, tracking and forensic investigations.

RLVD

Red Light Violation Detection

Automated detection of signal violations with evidence-grade image and video capture.

SVD

Speed Violation Detection

Section-speed and point-speed enforcement with calibrated sensors and court-admissible records.

Got a corridor, a city, or a state to deploy?

Share your scope โ€” we will scope, design and quote. Most pilots go from kickoff to first commissioned site within 30โ€“45 days.

Start a conversation